Postmortems are required for all SEV-1 and SEV-2 incidents, and optional for recurring SEV-3 patterns. The goal is learning, not blame.

Blameless means

Blameless means we focus on what failed in the system — processes, tooling, alerting, communication — not on who made a mistake. Engineers make good decisions with the information available at the time. The postmortem identifies where the system let them down.

Timeline

Postmortem template

Create a new doc in your wiki using the Postmortem template. Fill in:
  1. Incident summary — one paragraph: what happened, when, and what the impact was.
  2. Timeline — chronological log of events (use UTC). Include when the issue started, when it was detected, key actions taken, and when it was resolved.
  3. Root cause — what was the underlying cause? Use “5 Whys” if helpful.
  4. Contributing factors — what else made this worse or harder to detect?
  5. Impact — number of users affected, duration, data involved.
  6. What went well — things that helped during response.
  7. Action items — concrete, assigned, with due dates. At least one per significant contributing factor.

The review meeting

Keep it to 30–45 minutes. The incident owner facilitates. Everyone who was involved should attend; others are welcome. Agenda:
  1. Walk through the timeline (10 min)
  2. Discuss root cause and contributing factors (10 min)
  3. Review and assign action items (15 min)
Don’t re-hash decisions made during the incident. Focus on what to do differently next time.

Action items

Action items without owners don’t get done. Every item needs:
  • A clear description of what “done” looks like
  • A single owner (not a team)
  • A due date
Track them in your issue tracker. The engineering manager reviews open postmortem action items in the weekly team meeting.